CURRICULUM VITAE

 

name��������� :� Herbert Nothhelfer
function����� :� SAP application manager
year of birth :� 1964
nationality�� :� German
 

GENERAL

 

I am a certified SAP consultant in both the MM/IM and PP modules together with experience of LE.

I also have experience in WM, QM, SD and FI.� I have spent 20 years in the full life cycle carrying out configuration, development, testing, training, implementation and support in several companies.

These activities� covered purchasing, inventory management, and accounts payable and also doing significant work in production and warehousing.

Work extended into the technical side to include developping reports and add-ons in ABAP code but also interfaces and migrations with LSMW.

Prior to becoming a consultant I have spent many years in the manufacturing industry both as a user and managing IT departments.

This has meant my being involved in depth in different commercial areas including purchasing, production, engineering, and finance.

 

CAREER

 

10/2009 ���������������������� Europe�s market leader in the production of aluminium alloys / recycling of aluminium scrap

        • SAP Application Manager cross company
        • implementation and GoLive support HCM time recording
        • project manager for full cycle SAP implementations at 4 production sites
        • support cross SAP applications and 3rd party solutions (ORSoft)
        • redesign disposal authorisation and signing agreements and map the results to the relevant SAP processes
        • SAP implementation of PO release strategy and workflow functions
        • development and customization of intercompany processes via EDI and STOs
        • optical archiving of incoming invoices
        • � B2B processes, connecting strategic customers via EDI and BusinessConnector to our systems and business cases

 

07/2005 �� 09/2009������� consumer goods and food industry:

        • Program manager external manufacturing Outsourcing and Global Roll-out for 39 sites (ASIEN, US, Europe East&West)
        • Program manager NETWAEVER upgrade BI and Portal
        • Project manager worldwide UniCodeConversion ECC5.0, CRM4.0, BI7.0
        • Coordinator Upgrade SAP 4.6C to ECC5.0 for EMEAI (Europe, Middle East, Africa and India)
        • Ressource manager (eCATT project and testing teams)
        • Implementing SAP-Solutionmanager (change request process)
        • Lead Business Analyst� (FTS forecast-to-stock und OTC order-to cash)
        • Project manager and implementation SRM / EBP5.0 for EMEAI region

 

�         End of self-employment

 

 

11/2004 �� 06/2005������ funiture industry, area seating, cupboards and office-furniture:

        • Cooperation in the worldwide SAP harmonization project
        • Rolling-out Template SAP PP under SAP 4.7
        • Rolling-out Template SAP MM under SAP 4.7
        • responsible for movements of business/data/functions between manufacturing plants

 

 

08/2004 � 10/2004������ external auditors, area enterprise risk management:

        • AIS audit information system under SAP Enterprise 4.7
        • education sessions SAP for external auditors, audits for financial management
        • education sessions SAP for external auditors, audits for accounts receivable
        • education sessions SAP for external auditors, audits for accounts payable
        • education sessions SAP for external auditors, audits for asset management
        • education sessions SAP for external auditors, audits for materialsmanagement
        • education sessions SAP for external auditors, audits for securities and authorizations
        • Sarbanes-Oxley-Act with SAP Enterprise 4.7
        • GDPdu with SAP Enterprise 4.7

 

02/2003 � 10/2004������ funiture industry, area seatings, cupboards and office-furniture:

        • Project manager, Support, development
        • responsible for migration and interfaces (LSMW)
        • B2B procurement based on EDI functions for suppliers and customers
        • SAP Business Connector
        • interfaces from saws into SAP with saw optimizations
        • responsible for support, area MM (materialsmanagement)
        • responsible for support, area PP (production planning and scheduling)
        • responsible for support, area CO (controlling) forecasts and calculations
        • responsible for support, area VC (Variant configuration engine)

06/2002 � 09/2003������ pharmaceutical industry, area securities & authorizations:

        • Concept and realization of a global and local authorization draft with standard SAP functions
        • Consideration of branch-specific guiding rules for valuations, access controls and segregation of duties

04/2001 � 06/2002������ furniture industry, area cupboards and office-furniture: SAP Roll-out project

        • overall project manager SAP logistics modules for the economic processes
        • Partial project manager MM (materialsmanagement)
        • project manager legacy system migration, data and migration of processes
        • responsible for development and installation of the roll-out template
        • responsible for integration, interfaces, archiving software and document management of engineering documentations to drilling and set plans
        • Investigations to enterprise buyer and configureable E-procurement applications
        • analysis of SAP-CRM (customer relation management) and SAP-SCM (supply chain management) versus SAP R/3 classics

10/1998 - 12/2001������� furniture industry, area seating, cupboards and office-furniture:

        • Total project manager SAP logistics, with central topics of being:
          • Middle range business implementation of the SAP functions in the area SD (sales and distribution), MM (materialsmanagement) and PP (production planning and scheduling)
          • Process optimization in distribution and manufacturing
          • technical group binding of several independently operating production plants
          • Variant configuration and product modelling
          • Integration of R/3 Wood Add on's with investigation, analysis and confrontation the SAP IBU metal-paper-wood products
          • Variant calculation with product calculation and calculation of sales and production orders
          • Responsible for the whole logistic data takeover from IBM AS/ 400 (master data and movement data)
          • Migration and data settlement with the migration tool SAP LSMW (legacy system migration workbench)

03/1998 - 10/1998������� pharmaceutical industry, area research and development:

        • Introduction and development of a package for supervision of research studies and research projects during phases I up to IV, based on SAP R / 3 modules: MM (materialsmanagement), PS (project system), FI (finance management)
        • Implementation of productcosting with product calculation and binding to various evaluated production systems (BPCS)

05/1997 - 02/1998 �������pharmaceutical range for animal health:�

        • After Go-Live support of the logistics modules MM und PP with SAP R/3 3.0F with main focus on:

- subcontractors and third parties
- batch evaluation and reporting
- product pricing and costing
- worldwide forecasting, planing and scheduling out of LIS and SOP

        • Introduction of a worldwide SAP R/3 supportsystem based on intranet and internet components
        • projektleader responsible for definition and conversion of performance measures for implementation of forecast accuracy, third parties and group companies reporting

10/1996 - 03/1997������� German Telecommunication, division real-estates:

        • SAP projectleader R/3 3.0C / 3.0F for implementing and handling of the PS module(projectsystem). Developing internal IT projects and planning of building construction projects
        • Definition of project profiles and project structures
        • Definition of work breakdown structures and WBS elements
        • Interface responsibility for all financial-, materialprocesses together with the standard network usage

10/1995 - 09/1997������� Broadcast Television Services:

        • SAP-Projectmanager migration R/2 (4.3I) to R/3 (3.0C)
        • Coordinating and leading the complete migration of the modules: FI, AM, CO, PS, MM, PP, SD, SM.
        • Coordination logistics processes in the following stabelizing and optimizing of the project
        • Projektleader of the following subprojects:

- lending process of goods
- complete automated ordering process with main vendors
- LIFO balance sheet valuation and valuation to determine lowest values
- installation of special physical inventory processes
- vendor evaluations

        • Responsible consultant in developing and design of the modules MM, PP und QM
          Release change from 3.0C to 3.0F delta customizing and documentation for PP, MM and QM.

 

 

  • Independent consultant SAP:

 

07/1994 - 09/1995������� SAP AG Walldorf: Hotline Service Logistics R/2 (Rel. up to 5.0G)

 

            • materials management (RM) all modules R/2 (Rel. Up to 5.0G)
            • production planning and scheduling (PPS) all modules R/2 (Rel. Up to 5.0G)
            • sales and distribution (RV) all modules R/2 (Rel. Up to 5.0G)


1991-06/1994�������������� power industry: SAP consultant

 

            • Documentation of current organisational structures and inventory control including related subjects, analysis of weaknesses
            • Implementation of the SAP software to be organized in the Power supply industry
            • Training of� IT organisators and user training
            • Consultancy in the area of project management
            • Preparation of training materials providing the training
            • Managing of customization and modifications including the preparation of the requirements and maintaining the real usage
            • Upgrade from Release 4.3F to 5.0D including the change from a single entity to a multi entity environment
            • Draft for the production of achievement lists for the purpose of advertisement, assignment, supervision and decrease of projects in the service area with RM DIENST

 

1989-1991������������������� electrical industry: IT-Organisator

 

          • Representation of the company`s interests concerning the system development within the scope of CIM-projects (SAP Rel. 4.2)
          • Support of the central project organisation within the system design
          • On-Site responsibility for the systems design and prototyping of the SAP-Systems within the modules RM-MAT and RM-PPS

 

  • Practical Experience:

 

1985-1989������������������� German Federal Armed Forces

 

Development of existing DP-applications in logistics. Design of organisational flows and technical realisation

          • Programming in COBOL74 / COBOL 80
          • Programming ASSEMBLER 8086 / 8088

 

 

  • Education: Credit Institute

 

1981-1983 Education as a bank analyst
1983-1985 Head of branch office within the bank organisation

 

Gathering of wide experience in the field of business analysis and organization